Presented by {{author}}
Transit
How four new lines will connect every district by the end of Phase 3.
Today’s route
1
Where the network is today
Ridership, reliability and the gaps riders report most
2
The four new lines
Routes, stations and the districts each one connects
3
Building it in phases
What opens first, what follows and how we keep service running
4
Funding and next steps
The budget, the partners and the decisions we need today
2
Building the network in phases
1
Every home in the city within a ten-minute walk of a frequent train.
Today 54% of residents live that close to a train. The four new lines raise it to 91%.
Lines that meet where people already go
Most trips in the city start or end at one of nine places: the hospital, two universities, the old port and five neighbourhood centres. The new lines are drawn to meet there, not where land was cheapest.
That means fewer changes for most riders, and shorter waits because every interchange is served by at least two lines.
Five things we heard from riders
Three promises behind every line
1
Frequent
A train every five minutes from early morning until late evening on every line.
2
Connected
Every line meets at least two others, so most trips need one change at most.
3
Accessible
Lifts, level boarding and clear signs at every one of the new stations.
What the new network adds
1.2M
trips a day once all four lines are open
38
new stations, all step-free from day one
25%
shorter commute on average across the city
91%
of residents within a ten-minute walk of a station
Up from 54% today. The biggest gains are in the eastern districts.
How the network changes
Today
After Phase 3
Four phases, one network
1
Months 1 to 18
Red line
Port to the hospital, nine stations
2
Months 12 to 30
Green line
The two universities and the east side
3
Months 24 to 42
Blue line
Airport link and the northern loop
4
Months 36 to 54
Amber line
Orbital route joining every other line
Stations people are glad to wait in
Every new station has daylight at platform level, seating on both sides and a clear view of the next train’s arrival time.
“The new line cut my trip to the hospital from ninety minutes to twenty. It changed where I can work.”
Amira Haddad, rider on the pilot route
Who is building the network
Ines Varga
Network planning
Kwame Asante
Engineering lead
Sofia Lund
Rider experience
Ben Okoro
Funding and partners
1
2
3
4
Thank you
Comments on the plan are open until the end of the quarter.
plans@metrolines.example · 555-0177